What are the processes of purification engineering quality control?
There are many processes for the quality control of purification projects, including work quality, process quality, sub-project quality, sub-project quality, and unit project quality.
The method of project quality control should pay attention to from top to bottom, from first to last, the quality of each process will affect the quality of the next project. Therefore, every construction environment must be controlled. The key to the above processes is the quality of work and process.
First, make preparations. Construction preparations should run through the entire construction process, including construction preparations, unit project preparations, sub-project preparations, preparations before the start of the project, and preparations for the construction after the start. These tasks require dedicated personnel to be responsible and implement.
The content of construction preparation work is divided into: 1. Technical preparation work; 2. Material preparation work; 3. Organization preparation work; 4. Construction site preparation work. Quality control strategy in engineering; construction process quality supervision; inspection work for possible quality problems; separate plans and quality assurance measures are prepared in the design; all materials are configured in the laboratory; materials are regularly sent for inspection and composite; any Purification Product Quality issues must be carefully compounded by surveyors. No one can intervene in the quality control. For construction records, material qualification records, design changes, and water and electricity commissioning, there must be dedicated data personnel responsible for keeping them.
Construction process quality control content: 1. Strictly abide by the process regulations 2. Actively control the quality of the process activity conditions 3. Timely inspect the quality of the process activity effects. 4. Make control points at locations that are easy to be overlooked; 5. Make the process flow before and after construction, and the technicians shall cooperate with the construction site to operate.
Process quality control content: 1. People are the main factor in creating purification projects. Therefore, technicians must pass the unified assessment of the purification engineering company, rank in accordance with the relevant company management system, and hold certificates. In order for the workers to devote themselves to the work and establish a good engineering quality, it will be completed by experienced personnel who require high difficulty and precision. 2. Materials should have clear information on quality, price, and supply capacity. Reasonably purchase, transport and store.
Purification project construction control content: The predetermined construction plan must be realistic, so that the construction problems can be solved and technically approved. When forming written materials, financial personnel are required to compare benefits and security personnel to check. During construction, materials should be stacked neatly, roads should be unobstructed, and working environment should be clean. Regular follow-up inspection by supervisory personnel, quality evaluation, discovery, research and treatment, and meet the requirements of regulations and standards.
Key process quality measures: People have higher and higher requirements for the quality of construction projects, so quality is linked to business operations in the purification engineering company industry. As a construction company, we must insist on quality as the mainstay, do a good job of management systems in all aspects, formulate construction goals, and clarify personnel responsibilities.