About the construction of the clean room?
Home / News Center / Industry News / About the construction of the clean room?

About the construction of the clean room?

               
Update:2021-02-18 0:00:00
Summary:A dust-free workshop refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, air velocity and air distribution, noise, vibration, l......
A dust-free workshop refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, air velocity and air distribution, noise, vibration, lighting, and static electricity are controlled in A room that is specially designed within a certain range of needs. That is, no matter how the external air conditions change, the room can maintain the characteristics of cleanliness, temperature, humidity, and pressure that were originally set.
Engaged in the design, production, installation, commissioning and air-conditioning purification supporting equipment products of air purification projects, purification workshops, dust-free workshops, clean projects, and clean rooms. Regardless of whether it is a dust-free workshop or other projects, safety should be the top priority in all construction site management. We have summarized the following 10 points that must be paid attention to:
1. All exits should be equipped with safety protection measures for the construction of dust-free workshops, installation of protective fences, protective nets and cover protection measures
2. Strengthen the standardized management of safety net erection.
3. The clean room purification project strengthens the management of safety protection in the "limb" dangerous zone.
4. Strengthen the safety management of cross-construction operations.
5. The clean room purification project strengthens the safety management of high-altitude metal structures.
6. Strengthen the safety management of large concrete formwork and high-rise scaffolding.
7. Strengthen the safety management of vertical transportation equipment.
8. The clean room purification project strengthens the management of safe electricity use in construction.
9. Strengthen the safety management of seasonal construction.
10. The clean room purification project strengthens the safety management of inflammable and explosive materials.
Hollow Dismountable Seperation Wall System

Hollow Dismountable Seperation Wall System

Adopts environmental friendly material, no harmful......

Hand made PU panel

Hand made PU panel

Adopts good quality PCGI surface sheet with PU as......

Hand made paper honeycomb sand- wich panel with double layer magne-sium oxide boards

Hand made paper honeycomb sand- wich panel with double layer magne-sium oxide boards

Adopts good quality PCGI surface sheet with paper......

The connection type of panels

The connection type of panels

Insert type1.This connection type is easy for ins......

Pass box

Pass box

Pass box is a kind of auxiliary equipment, mainly......

Medical laminated steel door

Medical laminated steel door

Our purification door has good out look, strong, ......

OT door

OT door

Our purification door has good out look, strong, ......

Aluminum frame single door

Aluminum frame single door

Our purification door has good out look, strong, ......

customizable Auxiliary aluminum profile

customizable Auxiliary aluminum profile

Purification aluminum profile is the accessory to......

high quality Auxiliary aluminum profile

high quality Auxiliary aluminum profile

Purification aluminum profile is the accessory to......