About the construction of the clean room?
Home / News Center / Industry News / About the construction of the clean room?

About the construction of the clean room?

               
Update:2021-02-18 0:00:00
Summary:A dust-free workshop refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, air velocity and air distribution, noise, vibration, l......
A dust-free workshop refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, air velocity and air distribution, noise, vibration, lighting, and static electricity are controlled in A room that is specially designed within a certain range of needs. That is, no matter how the external air conditions change, the room can maintain the characteristics of cleanliness, temperature, humidity, and pressure that were originally set.
Engaged in the design, production, installation, commissioning and air-conditioning purification supporting equipment products of air purification projects, purification workshops, dust-free workshops, clean projects, and clean rooms. Regardless of whether it is a dust-free workshop or other projects, safety should be the top priority in all construction site management. We have summarized the following 10 points that must be paid attention to:
1. All exits should be equipped with safety protection measures for the construction of dust-free workshops, installation of protective fences, protective nets and cover protection measures
2. Strengthen the standardized management of safety net erection.
3. The clean room purification project strengthens the management of safety protection in the "limb" dangerous zone.
4. Strengthen the safety management of cross-construction operations.
5. The clean room purification project strengthens the safety management of high-altitude metal structures.
6. Strengthen the safety management of large concrete formwork and high-rise scaffolding.
7. Strengthen the safety management of vertical transportation equipment.
8. The clean room purification project strengthens the management of safe electricity use in construction.
9. Strengthen the safety management of seasonal construction.
10. The clean room purification project strengthens the safety management of inflammable and explosive materials.
Hollow Dismountable Seperation Wall System

Hollow Dismountable Seperation Wall System

Adopts environmental friendly material, no harmful......

Hand made hollow magnesium oxide panel

Hand made hollow magnesium oxide panel

Adopts good quality PCGI surface sheet with hollo......

Hand made hollow magnesium oxide panel

Hand made hollow magnesium oxide panel

Adopts good quality PCGI surface sheet with hollow......

Hand made rock wool sandwich panel with double layer magnesium oxide boards

Hand made rock wool sandwich panel with double layer magnesium oxide boards

Adopts good quality PCGI surface sheet with paper ......

Hand made rock wool sandwich panel

Hand made rock wool sandwich panel

Adopts good quality PCGI surface sheet with rock ......

Machine made paper honeycomb sandwich panel

Machine made paper honeycomb sandwich panel

Adopts paper honeycomb as the core illr. Using he......

Machine made silicone rock sandwich panel

Machine made silicone rock sandwich panel

Adopts silicone rock as the core fller. Using G.I......

Pass box

Pass box

Pass box is a kind of auxiliary equipment, mainly......

Wholesale cheap Auxiliary aluminum profile

Wholesale cheap Auxiliary aluminum profile

Purification aluminum profile is the accessory to......

indoor Auxiliary aluminum profile

indoor Auxiliary aluminum profile

Purification aluminum profile is the accessory to......